Friday, April 28, 2006


Lee finished his contracted work in the conservatory by leveling the floor with self-levelling compound. Didn't take much as it was pretty much level anyway - and level with the living room floor, too. I have put the offcuts from the kitchen worksurface into the study and my computer equipment so I am now using it as my main place of work - and I can now tidy up the mess in the living room. I have also moved some other surplus or not-yet used building materials along the floor behind the chair. Posted by Picasa

0 Comments:

Post a Comment

<< Home