
John came round this morning and we put up the vertical steel pillar. We got it squared and to the right height by packing under the base with stone and then drilled the holes for the bolts that went in half way up the pillar (using Steve's powerful drill). We then mixed specially hard concrete to pack under the pillar and then another batch of regular concrete to spread over the area in front of the pillar (where the stone flag had been initially).

0 Comments:
Post a Comment
<< Home