John brought round 2 buckets of concrete on Tuesday and 4 more on Thursday to fill the hole. This was to a level that the vertical steel beam will rest on and be bolted to, as well as being bolted to the wall and the horizontal beam. Once the beams are in then the remainder of the hole will be filled in with concrete. I will have to decide how to best insulate the floor. The floor appears to be covered with sandstones flags under a layer of tarmac. I would like to expose these if possible but will need to take them up individually and insert sufficient insulation under them in order to elliminate any possibility of damp. Will decide on this once the beams are in. Posted by Hello